Tuesday, 16 March 2010

Han Finishes His Pod

Before Han arrived, work was started constructing a humble bit of accomodation for him. As space is at a premium in RARA, we had to position it somewhere within the workshop (bedroom), with a bit sticking out over the route to the fire exit (verandah).

We never got it quite finished in time for Han's arrival, so it became an ongoing project for him to dip into when spare time was available. His contribution was a staircase, storage, a privacy screen, a desk, and an almighty paint job, all white on the inside, all orange on the outside.

No comments:

Post a Comment